Ester Cabled Shrug

I was able to convince E to take photos of my knitting this weekend. I'm busy finishing up the last of the Kitmas presents so his help was greatly appreciated.

I wanted to show my Ester Cabled Shrug, that I made for the AP company party on Dec 1. Yes, this is the sweater that I bought the yarn Saturday afternoon, took to Carmen del Playa Mexico, knitting while sitting at the pool, and finished just in time for the party.

I originally ordered the yarn online, but there was a snafu at the online shop and it didn't go out in time. This was actually for the best, as I was trying to match colors online, which is always fool-hearty. The yarn that eventually arrived is gorgeous, but completely the wrong color. So I hiked over to ImagiKnit and picked up the Malabrigo worsted in fuchsia, which was a perfect color match.

I worked on this while in Mexico a lot. I brought it with me to the pool. I sat in the common area of the hotel and knit while we chatted over dinner. I pulled it out on the airplanes and while waiting in the aiports (all four of them!). But it still wasn't enough.

For some reason my internal calendar was off and I thought I had an extra day when in fact I didn't. Opps. This led to 14 hours of knitting (with a 3 hour dinner and car riding break in the middle). At 2 am I decided that it would be better to get up early and resume knitting than to knit while that tired. I got up at 6 am (yes, 4 hours later) and knit for another 4 hours. Yes, that made for 18 hours of knitting within 24 hours. I do not recommend this approach.

I blocked the whole thing on the kitchen counter. I sprayed it lightly since I wanted to make sure that it would be dry in time to wear that evening. The length was spot on, but it was significantly shorter on the width. Like, 7 inches shorter in places. I was able to block it to get back all but a few inches in most cases. But blocking on the counter with just masking taped towels was a bit challenging. I got home from work and knit up the sides. Luckily there were only 2 seams.

I love this! It was able to block just fine and is plenty big around the back. The problem is that it doesn't come close to meeting in the front. With this dress I'm able to wear it open and it's fine. But if I were to knit it again I'd try to add more length some how so it could close.

It feels wonderful - so soft. Everyone at the party loved it and was so surprised that I had made it. The pattern was easy to remember (and I'm horrible about remembering patterns) and easy to do. My hands still haven't fully recovered though. My knuckles still ache a bit, and this is two weeks later. Of course, I've been knitting, hand sewing and writing longhand a lot. I need to just let them rest, I know. But it's so hard to do during Christmas.

Ester Cabled Shrug:
Started: November 22, 2008
Finished: December 1, 2008

About

  • One woman's adventure with yarn, fabric and needles.

About this Entry

This page contains a single entry by Chiara published on December 15, 2008 2:06 PM.

Yet Another Hat was the previous entry in this blog.

I Love My Viking! is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Archives

Powered by Movable Type 5.04